Bierwang gas storage · fill level today: Bierwang is 78.3% full
One German storage site as reported to GIE AGSI+ for the latest gas day. The forecast and its range are made for Germany as a whole, not per site.
In brief
Bierwang was 78.3% full on gas day 26 November 2026: 7.3 of 9.4 TWh of working gas. Thirty days earlier it was 80.3% full, and a year earlier, on gas day 26 November 2025, 69.1%. On that day it withdrew 25 GWh net. It holds 3.8% of Germany's working gas volume, the 9th largest of 45 German storage sites (depleted-field (porous) storage). Germany as a whole was 53.8% full on the same day.
| Fill level | 78.3% |
|---|---|
| Gas in storage | 7.35 TWh |
| Working gas volume | 9.39 TWh |
| 30 days earlier | 80.3% (27 October 2026) |
| A year earlier | 69.1% (26 November 2025) |
| Injection | 0 GWh/d |
| Withdrawal | 25 GWh/d |
| Share of Germany | 3.8% |
| Location | Bierwang, Bavaria |
| Type | depleted-field (porous) storage |
| Operator | Uniper Energy Storage |
| EIC | 21W0000000000613 |
Source: GIE AGSI+, facility-level reporting. Location: LBEG, Untertage-Gasspeicherung in Deutschland (2025).
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Running or announced
| When | Kind | Unavailable | Operator's description |
|---|---|---|---|
| 1 September 2026 to probably 30 September 2027 | planned | injection 90.7 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 33% |
Ended in the last 90 days
| When | Kind | Unavailable | Operator's description |
|---|---|---|---|
| 18 November 2026 | planned | injection 15.5 GWh/d | Maintenance of compressor.. Possible restriction: Reduction of injection rate by up to 15% |
| 17 November 2026 | planned | injection 15.5 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 15% |
| 16 November 2026 | planned | injection 46.4 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 45% |
| 10 November 2026 | planned | injection 46.4 GWh/d | Maintenancce of compressor. Possible restriction: Reduction of injection rate by up to 45% |
| 22 October 2026 | planned | injection 103.0 GWh/d, withdrawal 134.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| 21 October 2026 | planned | injection 103.0 GWh/d, withdrawal 134.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| 20 October 2026 | planned | injection 103.0 GWh/d, withdrawal 134.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| 17 August 2026 to probably 28 August 2026 | planned | injection 9.0 GWh/d, withdrawal 19.0 GWh/d | Valve replacements. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 8% |
Comparable storage sites
German sites of the same type as Bierwang, with a working gas volume within a factor of two.
| Site | Working gas | Fill | A year earlier |
|---|---|---|---|
| VSP NORD (Rehden, Jemgum) · depleted-field (porous) storage | 8.94 TWh | 53.8% | 76.3% |
| Uelsen · depleted-field (porous) storage | 9.87 TWh | 47.0% | 74.1% |
| Breitbrunn · depleted-field (porous) storage | 11.36 TWh | 6.1% | 47.8% |
| Inzenham-West · depleted-field (porous) storage | 4.80 TWh | 4.1% | 24.9% |
Same location, same operator
What this means for Germany
Questions and answers
- How full is the Bierwang gas storage?
- Bierwang was 78.3% full on gas day 26 November 2026: 7.3 of 9.4 TWh of working gas. Thirty days earlier it was 80.3% full, and a year earlier, on gas day 26 November 2025, 69.1%.
- Where is Bierwang and who operates it?
- Bierwang lies in Bavaria. It is operated by Uniper Energy Storage, which reports it to GIE AGSI+ under the EIC code 21W0000000000613.
- How large is Bierwang?
- Its working gas volume, the gas it can store and withdraw, is 9.4 TWh. It holds 3.8% of Germany's working gas volume, the 9th largest of 45 German storage sites (depleted-field (porous) storage).
- Why is Bierwang fuller or emptier than Germany as a whole?
- A single site's fill follows its customers' bookings and says little about supply as a whole. Germany's figure is the sum over all sites, and the 14-day forecast and its range are made for that sum, not per site.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%