Etzel ESE (Uniper Energy Storage) gas storage · fill level today: Etzel ESE (Uniper Energy Storage) is 65.0% full
One German storage site as reported to GIE AGSI+ for the latest gas day. The forecast and its range are made for Germany as a whole, not per site.
In brief
Etzel ESE (Uniper Energy Storage) was 65.0% full on gas day 26 November 2026: 7.0 of 10.9 TWh of working gas. Thirty days earlier it was 69.6% full, and a year earlier, on gas day 26 November 2025, 83.4% (9.6 TWh). Its working gas volume was 11.5 TWh then and is 10.9 TWh now, so the two percentages refer to different capacities. On that day it withdrew 112 GWh net. It holds 4.4% of Germany's working gas volume, the 4th largest of 45 German storage sites (salt cavern storage). Germany as a whole was 53.8% full on the same day.
| Fill level | 65.0% |
|---|---|
| Gas in storage | 7.05 TWh |
| Working gas volume | 10.85 TWh |
| 30 days earlier | 69.6% (27 October 2026) |
| A year earlier | 83.4% · 9.6 of 11.5 TWh (26 November 2025) |
| Injection | 0 GWh/d |
| Withdrawal | 112 GWh/d |
| Share of Germany | 4.4% |
| Location | Etzel, Lower Saxony |
| Type | salt cavern storage |
| Operator | Uniper Energy Storage |
| EIC | 21W0000000000168 |
Source: GIE AGSI+, facility-level reporting. Location: LBEG, Untertage-Gasspeicherung in Deutschland (2025).
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Ended in the last 90 days
| When | Kind | Unavailable | Operator's description |
|---|---|---|---|
| 2 October 2026 to probably 16 October 2026 | planned | injection 144.0 GWh/d | Maintenance of compressor unit. Possible Restriction : Reduction of injection rate by up to 33% |
| 24 August 2026 to probably 2 October 2026 | planned | withdrawal 203.0 GWh/d | Maintenance of withdrawal train. Possible restriction: Reduction of withdrawal rate by up to 33% |
| 14 September 2026 to probably 2 October 2026 | planned | injection 436.0 GWh/d, withdrawal 403.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
Comparable storage sites
German sites of the same type as Etzel ESE (Uniper Energy Storage), with a working gas volume within a factor of two.
| Site | Working gas | Fill | A year earlier |
|---|---|---|---|
| Etzel EKB · salt cavern storage | 10.49 TWh | 67.9% | 78.7% |
| Etzel Erdgas Lager EGL · salt cavern storage | 10.48 TWh | 95.1% | 89.5% |
| Jemgum H (SEFE Storage) · salt cavern storage | 9.45 TWh | 60.6% | 84.5% |
| Epe Uniper H-Gas · salt cavern storage | 15.38 TWh | 79.4% | 79.5% |
Same location, same operator
What this means for Germany
Questions and answers
- How full is the Etzel ESE (Uniper Energy Storage) gas storage?
- Etzel ESE (Uniper Energy Storage) was 65.0% full on gas day 26 November 2026: 7.0 of 10.9 TWh of working gas. Thirty days earlier it was 69.6% full, and a year earlier, on gas day 26 November 2025, 83.4% (9.6 TWh). Its working gas volume was 11.5 TWh then and is 10.9 TWh now, so the two percentages refer to different capacities.
- Where is Etzel ESE (Uniper Energy Storage) and who operates it?
- Etzel ESE (Uniper Energy Storage) lies in Lower Saxony. It is operated by Uniper Energy Storage, which reports it to GIE AGSI+ under the EIC code 21W0000000000168.
- How large is Etzel ESE (Uniper Energy Storage)?
- Its working gas volume, the gas it can store and withdraw, is 10.9 TWh. Thirty days earlier it was 69.6% full, and a year earlier, on gas day 26 November 2025, 83.4% (9.6 TWh). Its working gas volume was 11.5 TWh then and is 10.9 TWh now, so the two percentages refer to different capacities.
- Why is Etzel ESE (Uniper Energy Storage) fuller or emptier than Germany as a whole?
- A single site's fill follows its customers' bookings and says little about supply as a whole. Germany's figure is the sum over all sites, and the 14-day forecast and its range are made for that sum, not per site.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%