Etzel EKB gas storage · fill level today: Etzel EKB is 67.9% full

One German storage site as reported to GIE AGSI+ for the latest gas day. The forecast and its range are made for Germany as a whole, not per site.

In brief

Etzel EKB was 67.9% full on gas day 26 November 2026: 7.1 of 10.5 TWh of working gas. Thirty days earlier it was 88.4% full, and a year earlier, on gas day 26 November 2025, 78.7%. On that day it withdrew 171 GWh net. It holds 4.2% of Germany's working gas volume, the 5th largest of 45 German storage sites (salt cavern storage). Germany as a whole was 53.8% full on the same day.

Fill level67.9%
Gas in storage7.13 TWh
Working gas volume10.49 TWh
30 days earlier88.4% (27 October 2026)
A year earlier78.7% (26 November 2025)
Injection0 GWh/d
Withdrawal171 GWh/d
Share of Germany4.2%
LocationEtzel, Lower Saxony
Typesalt cavern storage
OperatorEKB
EIC21Z000000000291I

Source: GIE AGSI+, facility-level reporting. Location: LBEG, Untertage-Gasspeicherung in Deutschland (2025).

0%25%50%75%100%DecJanFebMarAprMayJunJulAugSeptOctNov67.9%78.7%
Figure 1. Etzel EKB: fill level on every gas day of the last twelve months. Percent of the site's working gas volume on that day, as reported to GIE AGSI+. Gaps are days without a report. Source: GIE AGSI+.

Reported outages

Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.

Ended in the last 90 days

WhenKindUnavailableOperator's description
2 November 2026 to 3 November 2026plannedwithdrawal 217.0 GWh/dhot medium fired heater repair works
16 September 2026plannedinjection 162.7 GWh/d, withdrawal 217.0 GWh/dAnnual BEP-maintenance works. Only Dutch connection (GTS) affected.
13 June 2026 to 4 September 2026plannedno amount givencavern repair works
21 August 2026 to 31 August 2026plannedwithdrawal 217.0 GWh/dWithdrawal Train Maintenance

Comparable storage sites

German sites of the same type as Etzel EKB, with a working gas volume within a factor of two.

SiteWorking gasFillA year earlier
Etzel Erdgas Lager EGL · salt cavern storage10.48 TWh95.1%89.5%
Etzel ESE (Uniper Energy Storage) · salt cavern storage10.85 TWh65.0%83.4%
Jemgum H (SEFE Storage) · salt cavern storage9.45 TWh60.6%84.5%
Epe Uniper H-Gas · salt cavern storage15.38 TWh79.4%79.5%

Same location, same operator

What this means for Germany

Questions and answers

How full is the Etzel EKB gas storage?
Etzel EKB was 67.9% full on gas day 26 November 2026: 7.1 of 10.5 TWh of working gas. Thirty days earlier it was 88.4% full, and a year earlier, on gas day 26 November 2025, 78.7%.
Where is Etzel EKB and who operates it?
Etzel EKB lies in Lower Saxony. It is operated by EKB, which reports it to GIE AGSI+ under the EIC code 21Z000000000291I.
How large is Etzel EKB?
Its working gas volume, the gas it can store and withdraw, is 10.5 TWh. It holds 4.2% of Germany's working gas volume, the 5th largest of 45 German storage sites (salt cavern storage).
Why is Etzel EKB fuller or emptier than Germany as a whole?
A single site's fill follows its customers' bookings and says little about supply as a whole. Germany's figure is the sum over all sites, and the 14-day forecast and its range are made for that sum, not per site.
How often are the figures updated?
Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.

Storage by location and operator

Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%

Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%

Other German storage sites

Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%