Epe gas storage · fill level today: The storage sites in Epe are 75.7% full
Every storage facility at Epe as reported to GIE AGSI+ for the latest gas day, added up. Each operator's share is listed below with its own page.
In brief
On gas day 26 November 2026 the 8 storage sites in Epe were 75.7% full together: 22.3 of 29.5 TWh of working gas. Thirty days earlier they were 82.7% full, and a year earlier, on gas day 26 November 2025, 81.9%. On that day they withdrew 267 GWh net. They hold 11.9% of Germany's working gas volume. Germany as a whole was 53.8% full.
| Storage site | Fill | Working gas | 30 days earlier | A year earlier |
|---|---|---|---|---|
| Epe Uniper H-Gas · Uniper Energy Storage | 79.4% | 15.38 TWh | 79.6% | 79.5% |
| Enschede - Epe (Nuon) · NUON Epe Gasspeicher | 71.5% | 2.71 TWh | 83.4% | 89.7% |
| Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) · RWE Gas Storage West | 87.6% | 2.53 TWh | 93.4% | 75.1% |
| Epe Trianel · Trianel Gasspeicher Epe | 67.8% | 2.10 TWh | 88.9% | 90.0% |
| Epe (MET Epe Speicher) · MET Epe Speicher | 39.2% | 2.03 TWh | 84.2% | 90.3% |
| Epe-NL-RWEGSWEST · RWE Gas Storage West | 86.8% | 1.70 TWh | 92.8% | 82.6% |
| Epe Uniper L-Gas · Uniper Energy Storage | 82.4% | 1.61 TWh | 83.8% | 75.9% |
| Enschede - Epe (Eneco) · Eneco Gasspeicher | 65.4% | 1.44 TWh | 72.8% | 88.0% |
| Total | 75.7% | 29.49 TWh | 82.7% | 81.9% |
Year-ago values: gas day 26 November 2025. The total is gas in storage over working gas volume, summed across the sites. Source: GIE AGSI+, facility-level reporting.
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Running or announced
| Site | When | Kind | Unavailable | Operator's description |
|---|---|---|---|---|
| Epe Uniper H-Gas | 3 August 2026 to probably 23 December 2026 | planned | no amount given | Maintenance canceled. . |
| Epe Uniper L-Gas | 12 October 2026 to probably 18 December 2026 | planned | injection 24.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Enschede - Epe (Nuon) | 2 November 2026 to 26 November 2026 | planned | injection 35.4 GWh/d | Outage of one Turbo compressor |
| Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) | 25 November 2026 to probably 1 April 2027 | planned | no amount given | Volume is partly not available because of technical measures at the cavern. |
| Epe Uniper H-Gas | 27 November 2026 to probably 1 December 2026 | planned | withdrawal 328.0 GWh/d | Installation of a valve. Possible restriction: Reduction of withdrawal rate by up to 70% |
| Epe (MET Epe Speicher) | 27 November 2026 to probably 1 December 2026 | planned | withdrawal 78.0 GWh/d | Installation of a valve Possible restriction: Reduction of withdrawal rate by up to 70% |
| Epe Uniper L-Gas | 11 January 2027 to probably 26 February 2027 | planned | injection 24.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Epe Uniper H-Gas | 14 January 2027 | planned | injection 124.0 GWh/d, withdrawal 175.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 14 January 2027 | planned | injection 18.0 GWh/d, withdrawal 45.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a, but not affecting the delivery of the SCB-Product of THE |
| Epe (MET Epe Speicher) | 14 January 2027 | planned | injection 15.7 GWh/d, withdrawal 41.8 GWh/d | Test of safety equipment Possible restriction: Entire storage facility n/a |
Ended in the last 90 days
| Site | When | Kind | Unavailable | Operator's description |
|---|---|---|---|---|
| Enschede - Epe (Nuon) | 24 November 2026 to 25 November 2026 | planned | injection 35.4 GWh/d | Outage of one Turbo compressor |
| Epe Trianel | 28 October 2026 to 29 October 2026 | unplanned | no amount given | Thermodynamical conditions Possible restriction: reduction of withdrawal capacity |
| Epe Uniper H-Gas | 26 October 2026 | planned | injection 50.0 GWh/d | Maintenance of compressor unit. Possible restriction: Reduction of injection rate by up to 60% |
| Epe Uniper L-Gas | 28 September 2026 to probably 22 October 2026 | planned | withdrawal 36.0 GWh/d | Container inspection FW 22. Possible restrictions: Reduction in withdrawal capacity by up to 30% |
| Epe Uniper H-Gas | 12 October 2026 to probably 19 October 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| Epe (MET Epe Speicher) | 2 October 2026 to probably 16 October 2026 | planned | injection 41.8 GWh/d, withdrawal 111.4 GWh/d | Maintenance storage piping Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 2 October 2026 to probably 16 October 2026 | planned | injection 331.0 GWh/d, withdrawal 469.0 GWh/d | Maintenance storage piping. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 2 October 2026 to probably 16 October 2026 | planned | injection 48.0 GWh/d, withdrawal 120.0 GWh/d | Installation of a new control loop. Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 5 October 2026 to probably 12 October 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| Epe (MET Epe Speicher) | 8 October 2026 | planned | no amount given | Test of safety equipment Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 8 October 2026 | planned | injection 124.0 GWh/d, withdrawal 176.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 8 October 2026 | planned | injection 18.0 GWh/d, withdrawal 45.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a, but not affecting the delivery of the SCB-Product of THE |
| Epe (MET Epe Speicher) | 6 October 2026 to probably 7 October 2026 | planned | no amount given | Maintenance of power supply Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 6 October 2026 to probably 7 October 2026 | planned | injection 317.0 GWh/d, withdrawal 450.0 GWh/d | Maintenance of power supply. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 6 October 2026 to probably 7 October 2026 | planned | injection 46.0 GWh/d, withdrawal 115.0 GWh/d | Maintenance work Power supply. Possible restriction: Entire storage facility n/a |
| Enschede - Epe (Nuon) | 2 October 2026 to 5 October 2026 | planned | injection 7.1 GWh/d | Outage of One Piston Compressor. |
| Epe (MET Epe Speicher) | 14 September 2026 to probably 2 October 2026 | planned | no amount given | No restriction. |
| Epe Uniper H-Gas | 14 September 2026 to probably 2 October 2026 | planned | injection 33.1 GWh/d, withdrawal 46.9 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10% |
| Enschede - Epe (Nuon) | 30 September 2026 to 1 October 2026 | unplanned | injection 70.8 GWh/d | Outage of two Turbo compressor |
| Enschede - Epe (Nuon) | 4 September 2026 to 30 September 2026 | planned | injection 85.0 GWh/d, withdrawal 141.6 GWh/d | Total Plant Revision |
| Epe Uniper H-Gas | 7 September 2026 to probably 27 September 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| Epe (MET Epe Speicher) | 21 September 2026 to probably 25 September 2026 | planned | injection 25.1 GWh/d | Maintenance of compressor Possible restriction: Reduction of injection rate by up to 60% |
| Epe Uniper L-Gas | 1 September 2026 to probably 25 September 2026 | planned | withdrawal 60.0 GWh/d | Maintenance of preheater. Possible restrictions: Reduction in withdrawal capacity by up to 50% |
| Epe Uniper H-Gas | 21 September 2026 to probably 25 September 2026 | planned | injection 198.7 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 60% |
| Epe Trianel | 5 September 2026 to probably 18 September 2026 | planned | injection 83.2 GWh/d, withdrawal 166.5 GWh/d | Maintenance |
| Epe (MET Epe Speicher) | 17 August 2026 to probably 4 September 2026 | planned | no amount given | No restriction. |
| Epe Uniper H-Gas | 17 August 2026 to probably 4 September 2026 | planned | injection 33.1 GWh/d, withdrawal 46.9 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10% |
What this means for Germany
Questions and answers
- How full is the gas storage in Epe?
- On gas day 26 November 2026 the 8 storage sites in Epe were 75.7% full together: 22.3 of 29.5 TWh of working gas. Thirty days earlier they were 82.7% full, and a year earlier, on gas day 26 November 2025, 81.9%.
- Which storage sites are in Epe?
- Epe in North Rhine-Westphalia has 8 storage entries in GIE AGSI+, reported by 6 operators: Uniper Energy Storage, NUON Epe Gasspeicher, RWE Gas Storage West, Trianel Gasspeicher Epe, MET Epe Speicher, Eneco Gasspeicher.
- Why does Epe appear several times in AGSI+?
- Several companies store gas at the same location, and each reports its share to GIE AGSI+ as a storage facility of its own. This page adds them up to the location's total.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Nüttermoor 42% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%