Epe gas storage · fill level today: The storage sites in Epe are 75.7% full

Every storage facility at Epe as reported to GIE AGSI+ for the latest gas day, added up. Each operator's share is listed below with its own page.

In brief

On gas day 26 November 2026 the 8 storage sites in Epe were 75.7% full together: 22.3 of 29.5 TWh of working gas. Thirty days earlier they were 82.7% full, and a year earlier, on gas day 26 November 2025, 81.9%. On that day they withdrew 267 GWh net. They hold 11.9% of Germany's working gas volume. Germany as a whole was 53.8% full.

Storage siteFillWorking gas30 days earlierA year earlier
Epe Uniper H-Gas · Uniper Energy Storage79.4%15.38 TWh79.6%79.5%
Enschede - Epe (Nuon) · NUON Epe Gasspeicher71.5%2.71 TWh83.4%89.7%
Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) · RWE Gas Storage West87.6%2.53 TWh93.4%75.1%
Epe Trianel · Trianel Gasspeicher Epe67.8%2.10 TWh88.9%90.0%
Epe (MET Epe Speicher) · MET Epe Speicher39.2%2.03 TWh84.2%90.3%
Epe-NL-RWEGSWEST · RWE Gas Storage West86.8%1.70 TWh92.8%82.6%
Epe Uniper L-Gas · Uniper Energy Storage82.4%1.61 TWh83.8%75.9%
Enschede - Epe (Eneco) · Eneco Gasspeicher65.4%1.44 TWh72.8%88.0%
Total75.7%29.49 TWh82.7%81.9%

Year-ago values: gas day 26 November 2025. The total is gas in storage over working gas volume, summed across the sites. Source: GIE AGSI+, facility-level reporting.

Reported outages

Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.

Running or announced

SiteWhenKindUnavailableOperator's description
Epe Uniper H-Gas3 August 2026 to probably 23 December 2026plannedno amount givenMaintenance canceled. .
Epe Uniper L-Gas12 October 2026 to probably 18 December 2026plannedinjection 24.0 GWh/dMaintenance of compressor. Possible restriction: Reduction of injection rate by up to 50%
Enschede - Epe (Nuon)2 November 2026 to 26 November 2026plannedinjection 35.4 GWh/dOutage of one Turbo compressor
Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026)25 November 2026 to probably 1 April 2027plannedno amount givenVolume is partly not available because of technical measures at the cavern.
Epe Uniper H-Gas27 November 2026 to probably 1 December 2026plannedwithdrawal 328.0 GWh/dInstallation of a valve. Possible restriction: Reduction of withdrawal rate by up to 70%
Epe (MET Epe Speicher)27 November 2026 to probably 1 December 2026plannedwithdrawal 78.0 GWh/dInstallation of a valve Possible restriction: Reduction of withdrawal rate by up to 70%
Epe Uniper L-Gas11 January 2027 to probably 26 February 2027plannedinjection 24.0 GWh/dMaintenance of compressor. Possible restriction: Reduction of injection rate by up to 50%
Epe Uniper H-Gas14 January 2027plannedinjection 124.0 GWh/d, withdrawal 175.0 GWh/dTest of safety equipment. Possible restriction: Entire storage facility n/a
Epe Uniper L-Gas14 January 2027plannedinjection 18.0 GWh/d, withdrawal 45.0 GWh/dTest of safety equipment. Possible restriction: Entire storage facility n/a, but not affecting the delivery of the SCB-Product of THE
Epe (MET Epe Speicher)14 January 2027plannedinjection 15.7 GWh/d, withdrawal 41.8 GWh/dTest of safety equipment Possible restriction: Entire storage facility n/a

Ended in the last 90 days

SiteWhenKindUnavailableOperator's description
Enschede - Epe (Nuon)24 November 2026 to 25 November 2026plannedinjection 35.4 GWh/dOutage of one Turbo compressor
Epe Trianel28 October 2026 to 29 October 2026unplannedno amount givenThermodynamical conditions Possible restriction: reduction of withdrawal capacity
Epe Uniper H-Gas26 October 2026plannedinjection 50.0 GWh/dMaintenance of compressor unit. Possible restriction: Reduction of injection rate by up to 60%
Epe Uniper L-Gas28 September 2026 to probably 22 October 2026plannedwithdrawal 36.0 GWh/dContainer inspection FW 22. Possible restrictions: Reduction in withdrawal capacity by up to 30%
Epe Uniper H-Gas12 October 2026 to probably 19 October 2026plannedinjection 16.6 GWh/d, withdrawal 23.5 GWh/dMaintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5%
Epe (MET Epe Speicher)2 October 2026 to probably 16 October 2026plannedinjection 41.8 GWh/d, withdrawal 111.4 GWh/dMaintenance storage piping Possible restriction: Entire storage facility n/a
Epe Uniper H-Gas2 October 2026 to probably 16 October 2026plannedinjection 331.0 GWh/d, withdrawal 469.0 GWh/dMaintenance storage piping. Possible restriction: Entire storage facility n/a
Epe Uniper L-Gas2 October 2026 to probably 16 October 2026plannedinjection 48.0 GWh/d, withdrawal 120.0 GWh/dInstallation of a new control loop. Possible restriction: Entire storage facility n/a
Epe Uniper H-Gas5 October 2026 to probably 12 October 2026plannedinjection 16.6 GWh/d, withdrawal 23.5 GWh/dMaintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5%
Epe (MET Epe Speicher)8 October 2026plannedno amount givenTest of safety equipment Possible restriction: Entire storage facility n/a
Epe Uniper H-Gas8 October 2026plannedinjection 124.0 GWh/d, withdrawal 176.0 GWh/dTest of safety equipment. Possible restriction: Entire storage facility n/a
Epe Uniper L-Gas8 October 2026plannedinjection 18.0 GWh/d, withdrawal 45.0 GWh/dTest of safety equipment. Possible restriction: Entire storage facility n/a, but not affecting the delivery of the SCB-Product of THE
Epe (MET Epe Speicher)6 October 2026 to probably 7 October 2026plannedno amount givenMaintenance of power supply Possible restriction: Entire storage facility n/a
Epe Uniper H-Gas6 October 2026 to probably 7 October 2026plannedinjection 317.0 GWh/d, withdrawal 450.0 GWh/dMaintenance of power supply. Possible restriction: Entire storage facility n/a
Epe Uniper L-Gas6 October 2026 to probably 7 October 2026plannedinjection 46.0 GWh/d, withdrawal 115.0 GWh/dMaintenance work Power supply. Possible restriction: Entire storage facility n/a
Enschede - Epe (Nuon)2 October 2026 to 5 October 2026plannedinjection 7.1 GWh/dOutage of One Piston Compressor.
Epe (MET Epe Speicher)14 September 2026 to probably 2 October 2026plannedno amount givenNo restriction.
Epe Uniper H-Gas14 September 2026 to probably 2 October 2026plannedinjection 33.1 GWh/d, withdrawal 46.9 GWh/dMaintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10%
Enschede - Epe (Nuon)30 September 2026 to 1 October 2026unplannedinjection 70.8 GWh/dOutage of two Turbo compressor
Enschede - Epe (Nuon)4 September 2026 to 30 September 2026plannedinjection 85.0 GWh/d, withdrawal 141.6 GWh/dTotal Plant Revision
Epe Uniper H-Gas7 September 2026 to probably 27 September 2026plannedinjection 16.6 GWh/d, withdrawal 23.5 GWh/dMaintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5%
Epe (MET Epe Speicher)21 September 2026 to probably 25 September 2026plannedinjection 25.1 GWh/dMaintenance of compressor Possible restriction: Reduction of injection rate by up to 60%
Epe Uniper L-Gas1 September 2026 to probably 25 September 2026plannedwithdrawal 60.0 GWh/dMaintenance of preheater. Possible restrictions: Reduction in withdrawal capacity by up to 50%
Epe Uniper H-Gas21 September 2026 to probably 25 September 2026plannedinjection 198.7 GWh/dMaintenance of compressor. Possible restriction: Reduction of injection rate by up to 60%
Epe Trianel5 September 2026 to probably 18 September 2026plannedinjection 83.2 GWh/d, withdrawal 166.5 GWh/dMaintenance
Epe (MET Epe Speicher)17 August 2026 to probably 4 September 2026plannedno amount givenNo restriction.
Epe Uniper H-Gas17 August 2026 to probably 4 September 2026plannedinjection 33.1 GWh/d, withdrawal 46.9 GWh/dMaintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10%

What this means for Germany

Questions and answers

How full is the gas storage in Epe?
On gas day 26 November 2026 the 8 storage sites in Epe were 75.7% full together: 22.3 of 29.5 TWh of working gas. Thirty days earlier they were 82.7% full, and a year earlier, on gas day 26 November 2025, 81.9%.
Which storage sites are in Epe?
Epe in North Rhine-Westphalia has 8 storage entries in GIE AGSI+, reported by 6 operators: Uniper Energy Storage, NUON Epe Gasspeicher, RWE Gas Storage West, Trianel Gasspeicher Epe, MET Epe Speicher, Eneco Gasspeicher.
Why does Epe appear several times in AGSI+?
Several companies store gas at the same location, and each reports its share to GIE AGSI+ as a storage facility of its own. This page adds them up to the location's total.
How often are the figures updated?
Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.

Storage by location and operator

Locations: Etzel 68% · Nüttermoor 42% · Jemgum 55%

Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%

Other German storage sites

Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%

Epe gas storage: fill level today 75.7% | gas-risiko.de