Enschede - Epe (Nuon) gas storage · fill level today: Enschede - Epe (Nuon) is 71.5% full

One German storage site as reported to GIE AGSI+ for the latest gas day. The forecast and its range are made for Germany as a whole, not per site.

In brief

Enschede - Epe (Nuon) was 71.5% full on gas day 26 November 2026: 1.9 of 2.7 TWh of working gas. Thirty days earlier it was 83.4% full, and a year earlier, on gas day 26 November 2025, 89.7%. On that day it withdrew 69 GWh net. It holds 1.1% of Germany's working gas volume, the 20th largest of 45 German storage sites (depleted-field (porous) storage). Germany as a whole was 53.8% full on the same day.

Fill level71.5%
Gas in storage1.94 TWh
Working gas volume2.71 TWh
30 days earlier83.4% (27 October 2026)
A year earlier89.7% (26 November 2025)
Injection0 GWh/d
Withdrawal69 GWh/d
Share of Germany1.1%
LocationEpe, North Rhine-Westphalia
Typedepleted-field (porous) storage
OperatorNUON Epe Gasspeicher
EIC21W000000000005D

Source: GIE AGSI+, facility-level reporting. Location: LBEG, Untertage-Gasspeicherung in Deutschland (2025).

0%25%50%75%100%DecJanFebMarAprMayJunJulAugSeptOctNov71.5%89.7%
Figure 1. Enschede - Epe (Nuon): fill level on every gas day of the last twelve months. Percent of the site's working gas volume on that day, as reported to GIE AGSI+. Gaps are days without a report. Source: GIE AGSI+.

Reported outages

Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.

Running or announced

WhenKindUnavailableOperator's description
2 November 2026 to 26 November 2026plannedinjection 35.4 GWh/dOutage of one Turbo compressor

Ended in the last 90 days

WhenKindUnavailableOperator's description
24 November 2026 to 25 November 2026plannedinjection 35.4 GWh/dOutage of one Turbo compressor
2 October 2026 to 5 October 2026plannedinjection 7.1 GWh/dOutage of One Piston Compressor.
30 September 2026 to 1 October 2026unplannedinjection 70.8 GWh/dOutage of two Turbo compressor
4 September 2026 to 30 September 2026plannedinjection 85.0 GWh/d, withdrawal 141.6 GWh/dTotal Plant Revision

Comparable storage sites

German sites of the same type as Enschede - Epe (Nuon), with a working gas volume within a factor of two.

SiteWorking gasFillA year earlier
Wolfersberg · depleted-field (porous) storage4.09 TWh1.2%6.1%
Schmidhausen · depleted-field (porous) storage1.79 TWh32.8%71.9%
Inzenham-West · depleted-field (porous) storage4.80 TWh4.1%24.9%

Same location, same operator

What this means for Germany

Questions and answers

How full is the Enschede - Epe (Nuon) gas storage?
Enschede - Epe (Nuon) was 71.5% full on gas day 26 November 2026: 1.9 of 2.7 TWh of working gas. Thirty days earlier it was 83.4% full, and a year earlier, on gas day 26 November 2025, 89.7%.
Where is Enschede - Epe (Nuon) and who operates it?
Enschede - Epe (Nuon) lies in North Rhine-Westphalia. It is operated by NUON Epe Gasspeicher, which reports it to GIE AGSI+ under the EIC code 21W000000000005D.
How large is Enschede - Epe (Nuon)?
Its working gas volume, the gas it can store and withdraw, is 2.7 TWh. It holds 1.1% of Germany's working gas volume, the 20th largest of 45 German storage sites (depleted-field (porous) storage).
Why is Enschede - Epe (Nuon) fuller or emptier than Germany as a whole?
A single site's fill follows its customers' bookings and says little about supply as a whole. Germany's figure is the sum over all sites, and the 14-day forecast and its range are made for that sum, not per site.
How often are the figures updated?
Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.

Storage by location and operator

Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%

Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%

Other German storage sites

Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%