Nüttermoor gas storage · fill level today: The storage sites in Nüttermoor are 41.9% full
Every storage facility at Nüttermoor as reported to GIE AGSI+ for the latest gas day, added up. Each operator's share is listed below with its own page.
In brief
On gas day 26 November 2026 the 3 storage sites in Nüttermoor were 41.9% full together: 3.0 of 7.1 TWh of working gas. Thirty days earlier they were 53.2% full, and a year earlier, on gas day 26 November 2025, 84.7% (4.7 TWh). Their working gas volume was 5.6 TWh then and is 7.1 TWh now. On that day they withdrew 84 GWh net. They hold 2.9% of Germany's working gas volume. Germany as a whole was 53.8% full.
| Storage site | Fill | Working gas | 30 days earlier | A year earlier |
|---|---|---|---|---|
| Nüttermoor H-3 · EWE Gasspeicher | 84.6% | 2.52 TWh | 98.7% | 81.2% |
| Nüttermoor H-2 · EWE Gasspeicher | 11.6% | 2.51 TWh | 16.2% | 93.7% |
| Nüttermoor H-5 · EWE Gasspeicher | 26.3% | 2.03 TWh | 42.7% | 79.1% |
| Total | 41.9% | 7.06 TWh | 53.2% | 84.7% |
Year-ago values: gas day 26 November 2025. The total is gas in storage over working gas volume, summed across the sites. Source: GIE AGSI+, facility-level reporting.
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Ended in the last 90 days
| Site | When | Kind | Unavailable | Operator's description |
|---|---|---|---|---|
| Nüttermoor H-5 | 21 October 2026 to 30 October 2026 | unplanned | no amount given | Unplanned maintenance |
| Nüttermoor H-3 | 25 October 2026 | unplanned | no amount given | Unplanned maintenance |
What this means for Germany
Questions and answers
- How full is the gas storage in Nüttermoor?
- On gas day 26 November 2026 the 3 storage sites in Nüttermoor were 41.9% full together: 3.0 of 7.1 TWh of working gas. Thirty days earlier they were 53.2% full, and a year earlier, on gas day 26 November 2025, 84.7% (4.7 TWh). Their working gas volume was 5.6 TWh then and is 7.1 TWh now.
- Which storage sites are in Nüttermoor?
- Nüttermoor in Lower Saxony has 3 storage entries in GIE AGSI+, reported by 1 operators: EWE Gasspeicher.
- Why does Nüttermoor appear several times in AGSI+?
- The operator reports the location to GIE AGSI+ as 3 separate storage facilities. This page adds them up to the location's total.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Epe 76% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%