VSP NORD (Rehden, Jemgum) gas storage · fill level today: VSP NORD (Rehden, Jemgum) is 53.8% full
One German storage site as reported to GIE AGSI+ for the latest gas day. The forecast and its range are made for Germany as a whole, not per site.
In brief
VSP NORD (Rehden, Jemgum) was 53.8% full on gas day 26 November 2026: 4.8 of 8.9 TWh of working gas. Thirty days earlier it was 80.3% full, and a year earlier, on gas day 26 November 2025, 76.3% (0.6 TWh). Its working gas volume was 0.8 TWh then and is 8.9 TWh now, so the two percentages refer to different capacities. On that day it withdrew 87 GWh net. It holds 3.6% of Germany's working gas volume, the 10th largest of 45 German storage sites (depleted-field (porous) storage). Germany as a whole was 53.8% full on the same day.
| Fill level | 53.8% |
|---|---|
| Gas in storage | 4.81 TWh |
| Working gas volume | 8.94 TWh |
| 30 days earlier | 80.3% (27 October 2026) |
| A year earlier | 76.3% · 0.6 of 0.8 TWh (26 November 2025) |
| Injection | 0 GWh/d |
| Withdrawal | 87 GWh/d |
| Share of Germany | 3.6% |
| Location | Rehden and Jemgum, Lower Saxony |
| Type | depleted-field (porous) storage |
| Operator | SEFE Storage (Germany) |
| EIC | 21W0000000001261 |
Source: GIE AGSI+, facility-level reporting. Location: LBEG, Untertage-Gasspeicherung in Deutschland (2025).
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Ended in the last 90 days
| When | Kind | Unavailable | Operator's description |
|---|---|---|---|
| 9 October 2026 to 16 October 2026 | planned | withdrawal 159.2 GWh/d | The limitation of withdrawal rate amounts to 100%. |
| 27 September 2026 to 9 October 2026 | planned | injection 103.5 GWh/d, withdrawal 159.2 GWh/d | The limitation of injection- and withdrawal rate amounts to 100%. |
Comparable storage sites
German sites of the same type as VSP NORD (Rehden, Jemgum), with a working gas volume within a factor of two.
| Site | Working gas | Fill | A year earlier |
|---|---|---|---|
| Bierwang · depleted-field (porous) storage | 9.39 TWh | 78.3% | 69.1% |
| Uelsen · depleted-field (porous) storage | 9.87 TWh | 47.0% | 74.1% |
| Breitbrunn · depleted-field (porous) storage | 11.36 TWh | 6.1% | 47.8% |
| Inzenham-West · depleted-field (porous) storage | 4.80 TWh | 4.1% | 24.9% |
Same location, same operator
What this means for Germany
Questions and answers
- How full is the VSP NORD (Rehden, Jemgum) gas storage?
- VSP NORD (Rehden, Jemgum) was 53.8% full on gas day 26 November 2026: 4.8 of 8.9 TWh of working gas. Thirty days earlier it was 80.3% full, and a year earlier, on gas day 26 November 2025, 76.3% (0.6 TWh). Its working gas volume was 0.8 TWh then and is 8.9 TWh now, so the two percentages refer to different capacities.
- Where is VSP NORD (Rehden, Jemgum) and who operates it?
- VSP NORD (Rehden, Jemgum) lies in Lower Saxony. It is operated by SEFE Storage (Germany), which reports it to GIE AGSI+ under the EIC code 21W0000000001261.
- How large is VSP NORD (Rehden, Jemgum)?
- Its working gas volume, the gas it can store and withdraw, is 8.9 TWh. Thirty days earlier it was 80.3% full, and a year earlier, on gas day 26 November 2025, 76.3% (0.6 TWh). Its working gas volume was 0.8 TWh then and is 8.9 TWh now, so the two percentages refer to different capacities.
- Why is VSP NORD (Rehden, Jemgum) fuller or emptier than Germany as a whole?
- A single site's fill follows its customers' bookings and says little about supply as a whole. Germany's figure is the sum over all sites, and the 14-day forecast and its range are made for that sum, not per site.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%