Uniper gas storage in Germany · fill level today: Uniper's German storage sites are 65.3% full
Every German storage site Uniper reports to GIE AGSI+, added up for the latest gas day. Each site is listed below with its own page.
In brief
On gas day 26 November 2026 the 6 German storage sites operated by Uniper were 65.3% full together: 38.6 of 59.1 TWh of working gas. Thirty days earlier they were 67.5% full, and a year earlier, on gas day 26 November 2025, 74.3%. On that day they withdrew 183 GWh net. They hold 23.9% of Germany's working gas volume. Germany as a whole was 53.8% full.
| Storage site | Fill | Working gas | 30 days earlier | A year earlier |
|---|---|---|---|---|
| Epe Uniper H-Gas | 79.4% | 15.38 TWh | 79.6% | 79.5% |
| Breitbrunn | 6.1% | 11.36 TWh | 9.8% | 47.8% |
| Etzel ESE (Uniper Energy Storage) | 65.0% | 10.85 TWh | 69.6% | 83.4% |
| Etzel Erdgas Lager EGL | 95.1% | 10.48 TWh | 96.4% | 89.5% |
| Bierwang | 78.3% | 9.39 TWh | 80.3% | 69.1% |
| Epe Uniper L-Gas | 82.4% | 1.61 TWh | 83.8% | 75.9% |
| Total | 65.3% | 59.06 TWh | 67.5% | 74.3% |
Year-ago values: gas day 26 November 2025. The total is gas in storage over working gas volume, summed across the sites. Source: GIE AGSI+, facility-level reporting.
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Running or announced
| Site | When | Kind | Unavailable | Operator's description |
|---|---|---|---|---|
| Epe Uniper H-Gas | 3 August 2026 to probably 23 December 2026 | planned | no amount given | Maintenance canceled. . |
| Bierwang | 1 September 2026 to probably 30 September 2027 | planned | injection 90.7 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 33% |
| Epe Uniper L-Gas | 12 October 2026 to probably 18 December 2026 | planned | injection 24.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Epe Uniper H-Gas | 27 November 2026 to probably 1 December 2026 | planned | withdrawal 328.0 GWh/d | Installation of a valve. Possible restriction: Reduction of withdrawal rate by up to 70% |
| Epe Uniper L-Gas | 11 January 2027 to probably 26 February 2027 | planned | injection 24.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Epe Uniper H-Gas | 14 January 2027 | planned | injection 124.0 GWh/d, withdrawal 175.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 14 January 2027 | planned | injection 18.0 GWh/d, withdrawal 45.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a, but not affecting the delivery of the SCB-Product of THE |
Ended in the last 90 days
| Site | When | Kind | Unavailable | Operator's description |
|---|---|---|---|---|
| Breitbrunn | 20 November 2026 | planned | injection 13.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Breitbrunn | 19 November 2026 | planned | injection 13.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Bierwang | 18 November 2026 | planned | injection 15.5 GWh/d | Maintenance of compressor.. Possible restriction: Reduction of injection rate by up to 15% |
| Bierwang | 17 November 2026 | planned | injection 15.5 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 15% |
| Bierwang | 16 November 2026 | planned | injection 46.4 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 45% |
| Breitbrunn | 12 November 2026 | planned | injection 13.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Breitbrunn | 11 November 2026 | planned | injection 13.0 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 50% |
| Bierwang | 10 November 2026 | planned | injection 46.4 GWh/d | Maintenancce of compressor. Possible restriction: Reduction of injection rate by up to 45% |
| Epe Uniper H-Gas | 26 October 2026 | planned | injection 50.0 GWh/d | Maintenance of compressor unit. Possible restriction: Reduction of injection rate by up to 60% |
| Epe Uniper L-Gas | 28 September 2026 to probably 22 October 2026 | planned | withdrawal 36.0 GWh/d | Container inspection FW 22. Possible restrictions: Reduction in withdrawal capacity by up to 30% |
| Bierwang | 22 October 2026 | planned | injection 103.0 GWh/d, withdrawal 134.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Bierwang | 21 October 2026 | planned | injection 103.0 GWh/d, withdrawal 134.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Bierwang | 20 October 2026 | planned | injection 103.0 GWh/d, withdrawal 134.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 12 October 2026 to probably 19 October 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| Epe Uniper H-Gas | 2 October 2026 to probably 16 October 2026 | planned | injection 331.0 GWh/d, withdrawal 469.0 GWh/d | Maintenance storage piping. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 2 October 2026 to probably 16 October 2026 | planned | injection 48.0 GWh/d, withdrawal 120.0 GWh/d | Installation of a new control loop. Possible restriction: Entire storage facility n/a |
| Etzel ESE (Uniper Energy Storage) | 2 October 2026 to probably 16 October 2026 | planned | injection 144.0 GWh/d | Maintenance of compressor unit. Possible Restriction : Reduction of injection rate by up to 33% |
| Epe Uniper H-Gas | 5 October 2026 to probably 12 October 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| Breitbrunn | 8 October 2026 | planned | injection 26.0 GWh/d, withdrawal 54.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 8 October 2026 | planned | injection 124.0 GWh/d, withdrawal 176.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 8 October 2026 | planned | injection 18.0 GWh/d, withdrawal 45.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a, but not affecting the delivery of the SCB-Product of THE |
| Epe Uniper H-Gas | 6 October 2026 to probably 7 October 2026 | planned | injection 317.0 GWh/d, withdrawal 450.0 GWh/d | Maintenance of power supply. Possible restriction: Entire storage facility n/a |
| Epe Uniper L-Gas | 6 October 2026 to probably 7 October 2026 | planned | injection 46.0 GWh/d, withdrawal 115.0 GWh/d | Maintenance work Power supply. Possible restriction: Entire storage facility n/a |
| Breitbrunn | 7 October 2026 | planned | injection 26.0 GWh/d, withdrawal 54.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Etzel ESE (Uniper Energy Storage) | 24 August 2026 to probably 2 October 2026 | planned | withdrawal 203.0 GWh/d | Maintenance of withdrawal train. Possible restriction: Reduction of withdrawal rate by up to 33% |
| Etzel ESE (Uniper Energy Storage) | 14 September 2026 to probably 2 October 2026 | planned | injection 436.0 GWh/d, withdrawal 403.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Epe Uniper H-Gas | 14 September 2026 to probably 2 October 2026 | planned | injection 33.1 GWh/d, withdrawal 46.9 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10% |
| Epe Uniper H-Gas | 7 September 2026 to probably 27 September 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| Epe Uniper L-Gas | 1 September 2026 to probably 25 September 2026 | planned | withdrawal 60.0 GWh/d | Maintenance of preheater. Possible restrictions: Reduction in withdrawal capacity by up to 50% |
| Epe Uniper H-Gas | 21 September 2026 to probably 25 September 2026 | planned | injection 198.7 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 60% |
| Epe Uniper H-Gas | 17 August 2026 to probably 4 September 2026 | planned | injection 33.1 GWh/d, withdrawal 46.9 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10% |
| Bierwang | 17 August 2026 to probably 28 August 2026 | planned | injection 9.0 GWh/d, withdrawal 19.0 GWh/d | Valve replacements. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 8% |
What this means for Germany
Questions and answers
- How full is Uniper's gas storage?
- On gas day 26 November 2026 the 6 German storage sites operated by Uniper were 65.3% full together: 38.6 of 59.1 TWh of working gas. Thirty days earlier they were 67.5% full, and a year earlier, on gas day 26 November 2025, 74.3%.
- Which storage sites does Uniper operate?
- Uniper reports 6 German storage sites to GIE AGSI+: Epe Uniper H-Gas, Breitbrunn, Etzel ESE (Uniper Energy Storage), Etzel Erdgas Lager EGL, Bierwang, Epe Uniper L-Gas. They lie in Epe, Breitbrunn, Etzel, Bierwang.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%
Operators: EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%