MET gas storage in Germany · fill level today: MET's German storage sites are 44.9% full

Every German storage site MET reports to GIE AGSI+, added up for the latest gas day. Each site is listed below with its own page.

In brief

On gas day 26 November 2026 the 3 German storage sites operated by MET were 44.9% full together: 2.3 of 5.2 TWh of working gas. Thirty days earlier they were 62.7% full, and a year earlier, on gas day 26 November 2025, 93.4%. On that day they withdrew 57 GWh net. They hold 2.1% of Germany's working gas volume. Germany as a whole was 53.8% full.

Storage siteFillWorking gas30 days earlierA year earlier
Epe (MET Epe Speicher)39.2%2.03 TWh84.2%90.3%
Reckrod74.2%1.61 TWh74.4%97.1%
Etzel ESE (MET)21.5%1.51 TWh21.6%93.8%
Total44.9%5.15 TWh62.7%93.4%

Year-ago values: gas day 26 November 2025. The total is gas in storage over working gas volume, summed across the sites. Source: GIE AGSI+, facility-level reporting.

Reported outages

Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.

Running or announced

SiteWhenKindUnavailableOperator's description
Epe (MET Epe Speicher)27 November 2026 to probably 1 December 2026plannedwithdrawal 78.0 GWh/dInstallation of a valve Possible restriction: Reduction of withdrawal rate by up to 70%
Epe (MET Epe Speicher)14 January 2027plannedinjection 15.7 GWh/d, withdrawal 41.8 GWh/dTest of safety equipment Possible restriction: Entire storage facility n/a

Ended in the last 90 days

SiteWhenKindUnavailableOperator's description
Reckrod28 September 2026 to probably 23 October 2026plannedinjection 25.3 GWh/d, withdrawal 50.6 GWh/dAnnual maintenance period.
Epe (MET Epe Speicher)2 October 2026 to probably 16 October 2026plannedinjection 41.8 GWh/d, withdrawal 111.4 GWh/dMaintenance storage piping Possible restriction: Entire storage facility n/a
Etzel ESE (MET)2 October 2026 to probably 16 October 2026plannedno amount givenMaintenance of compressor unit Possible Restriction : Reduction of injection rate by up to 33%
Epe (MET Epe Speicher)8 October 2026plannedno amount givenTest of safety equipment Possible restriction: Entire storage facility n/a
Epe (MET Epe Speicher)6 October 2026 to probably 7 October 2026plannedno amount givenMaintenance of power supply Possible restriction: Entire storage facility n/a
Etzel ESE (MET)24 August 2026 to probably 2 October 2026plannedwithdrawal 15.4 GWh/dMaintenance of withdrawal train Possible restriction: Reduction of withdrawal rate by up to 33%
Etzel ESE (MET)14 September 2026 to probably 2 October 2026plannedinjection 57.8 GWh/d, withdrawal 46.8 GWh/dTest of safety equipment Possible restriction: Entire storage facility n/a
Epe (MET Epe Speicher)14 September 2026 to probably 2 October 2026plannedno amount givenNo restriction.
Etzel ESE (MET)7 September 2026 to probably 25 September 2026plannedno amount givenTest of safety equipment Possible restriction: Entire storage facility n/a
Epe (MET Epe Speicher)21 September 2026 to probably 25 September 2026plannedinjection 25.1 GWh/dMaintenance of compressor Possible restriction: Reduction of injection rate by up to 60%
Etzel ESE (MET)16 September 2026plannedno amount givenMaintenance BEP Pipeline Connection to GTS System n/a
Epe (MET Epe Speicher)17 August 2026 to probably 4 September 2026plannedno amount givenNo restriction.

What this means for Germany

Questions and answers

How full is MET's gas storage?
On gas day 26 November 2026 the 3 German storage sites operated by MET were 44.9% full together: 2.3 of 5.2 TWh of working gas. Thirty days earlier they were 62.7% full, and a year earlier, on gas day 26 November 2025, 93.4%.
Which storage sites does MET operate?
MET reports 3 German storage sites to GIE AGSI+: Epe (MET Epe Speicher), Reckrod, Etzel ESE (MET). They lie in Epe, Reckrod, Etzel.
How often are the figures updated?
Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.

Storage by location and operator

Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%

Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58%

Other German storage sites

Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%

MET gas storage in Germany: fill level today 44.9% | gas-risiko.de