Epe Uniper H-Gas gas storage · fill level today: Epe Uniper H-Gas is 79.4% full
One German storage site as reported to GIE AGSI+ for the latest gas day. The forecast and its range are made for Germany as a whole, not per site.
In brief
Epe Uniper H-Gas was 79.4% full on gas day 26 November 2026: 12.2 of 15.4 TWh of working gas. Thirty days earlier it was 79.6% full, and a year earlier, on gas day 26 November 2025, 79.5% (13.1 TWh). Its working gas volume was 16.5 TWh then and is 15.4 TWh now, so the two percentages refer to different capacities. On that day it withdrew 7 GWh net. It holds 6.2% of Germany's working gas volume, the 2nd largest of 45 German storage sites (salt cavern storage). Germany as a whole was 53.8% full on the same day.
| Fill level | 79.4% |
|---|---|
| Gas in storage | 12.21 TWh |
| Working gas volume | 15.38 TWh |
| 30 days earlier | 79.6% (27 October 2026) |
| A year earlier | 79.5% · 13.1 of 16.5 TWh (26 November 2025) |
| Injection | 0 GWh/d |
| Withdrawal | 7 GWh/d |
| Share of Germany | 6.2% |
| Location | Epe, North Rhine-Westphalia |
| Type | salt cavern storage |
| Operator | Uniper Energy Storage |
| EIC | 21W000000000066U |
Source: GIE AGSI+, facility-level reporting. Location: LBEG, Untertage-Gasspeicherung in Deutschland (2025).
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Running or announced
| When | Kind | Unavailable | Operator's description |
|---|---|---|---|
| 3 August 2026 to probably 23 December 2026 | planned | no amount given | Maintenance canceled. . |
| 27 November 2026 to probably 1 December 2026 | planned | withdrawal 328.0 GWh/d | Installation of a valve. Possible restriction: Reduction of withdrawal rate by up to 70% |
| 14 January 2027 | planned | injection 124.0 GWh/d, withdrawal 175.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
Ended in the last 90 days
| When | Kind | Unavailable | Operator's description |
|---|---|---|---|
| 26 October 2026 | planned | injection 50.0 GWh/d | Maintenance of compressor unit. Possible restriction: Reduction of injection rate by up to 60% |
| 12 October 2026 to probably 19 October 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| 2 October 2026 to probably 16 October 2026 | planned | injection 331.0 GWh/d, withdrawal 469.0 GWh/d | Maintenance storage piping. Possible restriction: Entire storage facility n/a |
| 5 October 2026 to probably 12 October 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| 8 October 2026 | planned | injection 124.0 GWh/d, withdrawal 176.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| 6 October 2026 to probably 7 October 2026 | planned | injection 317.0 GWh/d, withdrawal 450.0 GWh/d | Maintenance of power supply. Possible restriction: Entire storage facility n/a |
| 14 September 2026 to probably 2 October 2026 | planned | injection 33.1 GWh/d, withdrawal 46.9 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10% |
| 7 September 2026 to probably 27 September 2026 | planned | injection 16.6 GWh/d, withdrawal 23.5 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 5%, reduction of withdrawal rate by up to 5% |
| 21 September 2026 to probably 25 September 2026 | planned | injection 198.7 GWh/d | Maintenance of compressor. Possible restriction: Reduction of injection rate by up to 60% |
| 17 August 2026 to probably 4 September 2026 | planned | injection 33.1 GWh/d, withdrawal 46.9 GWh/d | Maintenance of cavern. Possible restriction: Reduction of injection rate by up to 10%, reduction of withdrawal rate by up to 10% |
Comparable storage sites
German sites of the same type as Epe Uniper H-Gas, with a working gas volume within a factor of two.
| Site | Working gas | Fill | A year earlier |
|---|---|---|---|
| Etzel ESE (Uniper Energy Storage) · salt cavern storage | 10.85 TWh | 65.0% | 83.4% |
| Etzel EKB · salt cavern storage | 10.49 TWh | 67.9% | 78.7% |
| Etzel Erdgas Lager EGL · salt cavern storage | 10.48 TWh | 95.1% | 89.5% |
| Jemgum H (SEFE Storage) · salt cavern storage | 9.45 TWh | 60.6% | 84.5% |
Same location, same operator
What this means for Germany
Questions and answers
- How full is the Epe Uniper H-Gas gas storage?
- Epe Uniper H-Gas was 79.4% full on gas day 26 November 2026: 12.2 of 15.4 TWh of working gas. Thirty days earlier it was 79.6% full, and a year earlier, on gas day 26 November 2025, 79.5% (13.1 TWh). Its working gas volume was 16.5 TWh then and is 15.4 TWh now, so the two percentages refer to different capacities.
- Where is Epe Uniper H-Gas and who operates it?
- Epe Uniper H-Gas lies in North Rhine-Westphalia. It is operated by Uniper Energy Storage, which reports it to GIE AGSI+ under the EIC code 21W000000000066U.
- How large is Epe Uniper H-Gas?
- Its working gas volume, the gas it can store and withdraw, is 15.4 TWh. Thirty days earlier it was 79.6% full, and a year earlier, on gas day 26 November 2025, 79.5% (13.1 TWh). Its working gas volume was 16.5 TWh then and is 15.4 TWh now, so the two percentages refer to different capacities.
- Why is Epe Uniper H-Gas fuller or emptier than Germany as a whole?
- A single site's fill follows its customers' bookings and says little about supply as a whole. Germany's figure is the sum over all sites, and the 14-day forecast and its range are made for that sum, not per site.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Etzel 68% · Epe 76% · Nüttermoor 42% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%