Etzel gas storage · fill level today: The storage sites in Etzel are 68.3% full
Every storage facility at Etzel as reported to GIE AGSI+ for the latest gas day, added up. Each operator's share is listed below with its own page.
In brief
On gas day 26 November 2026 the 9 storage sites in Etzel were 68.3% full together: 31.0 of 45.5 TWh of working gas. Thirty days earlier they were 78.5% full, and a year earlier, on gas day 26 November 2025, 83.5%. On that day they withdrew 520 GWh net. They hold 18.4% of Germany's working gas volume. Germany as a whole was 53.8% full.
| Storage site | Fill | Working gas | 30 days earlier | A year earlier |
|---|---|---|---|---|
| Etzel ESE (Uniper Energy Storage) · Uniper Energy Storage | 65.0% | 10.85 TWh | 69.6% | 83.4% |
| Etzel EKB · EKB | 67.9% | 10.49 TWh | 88.4% | 78.7% |
| Etzel Erdgas Lager EGL · Uniper Energy Storage | 95.1% | 10.48 TWh | 96.4% | 89.5% |
| Etzel ESE (OMV) · OMV Gas Storage Germany | 36.5% | 4.74 TWh | 50.8% | 76.5% |
| Etzel EGL (Equinor Storage Deutschland) · Equinor Storage Deutschland | 70.0% | 2.14 TWh | 80.2% | 97.0% |
| Etzel EnBW (VGS) · EnBW Etzel Speicher | 73.1% | 2.07 TWh | 84.8% | 84.9% |
| Etzel EDF (VGS) · EDF Gas Deutschland | 53.8% | 1.95 TWh | 81.0% | 69.6% |
| Etzel ESE (MET) · MET Speicher | 21.5% | 1.51 TWh | 21.6% | 93.8% |
| Etzel ESE (VGS) · VNG Gasspeicher GmbH (6) | 64.7% | 1.23 TWh | 79.2% | 87.9% |
| Total | 68.3% | 45.46 TWh | 78.5% | 83.5% |
Year-ago values: gas day 26 November 2025. The total is gas in storage over working gas volume, summed across the sites. Source: GIE AGSI+, facility-level reporting.
Reported outages
Planned and unplanned limits on injection or withdrawal that the site's operator reported to GIE AGSI+ under REMIT. The description is the operator's own, usually in English. A report says what may be unavailable, not what happened to the fill.
Ended in the last 90 days
| Site | When | Kind | Unavailable | Operator's description |
|---|---|---|---|---|
| Etzel ESE (OMV) | 17 November 2026 to 19 November 2026 | planned | injection 23.7 GWh/d | Maintenance of the compressor unit |
| Etzel ESE (VGS) | 18 November 2026 | planned | injection 29.2 GWh/d | Maintenance: 100% reduction of injection rate. |
| Etzel ESE (OMV) | 18 November 2026 | unplanned | injection 71.8 GWh/d | Maintenance |
| Etzel ESE (OMV) | 16 November 2026 | unplanned | withdrawal 39.0 GWh/d | Maintenance |
| Etzel EKB | 2 November 2026 to 3 November 2026 | planned | withdrawal 217.0 GWh/d | hot medium fired heater repair works |
| Etzel ESE (OMV) | 2 October 2026 to 16 October 2026 | planned | injection 23.7 GWh/d | Maintenance of the compressor unit |
| Etzel ESE (MET) | 2 October 2026 to probably 16 October 2026 | planned | no amount given | Maintenance of compressor unit Possible Restriction : Reduction of injection rate by up to 33% |
| Etzel ESE (Uniper Energy Storage) | 2 October 2026 to probably 16 October 2026 | planned | injection 144.0 GWh/d | Maintenance of compressor unit. Possible Restriction : Reduction of injection rate by up to 33% |
| Etzel ESE (OMV) | 2 October 2026 to 6 October 2026 | planned | injection 23.7 GWh/d | Maintenance of the compressor unit |
| Etzel ESE (MET) | 24 August 2026 to probably 2 October 2026 | planned | withdrawal 15.4 GWh/d | Maintenance of withdrawal train Possible restriction: Reduction of withdrawal rate by up to 33% |
| Etzel ESE (VGS) | 24 August 2026 to probably 2 October 2026 | planned | withdrawal 15.5 GWh/d | Maintenance of withdrawal train Possible restriction depending on all nominations: 33% of interruptible withdrawal rate, no restriction of firm withdrawal rate expected. |
| Etzel ESE (MET) | 14 September 2026 to probably 2 October 2026 | planned | injection 57.8 GWh/d, withdrawal 46.8 GWh/d | Test of safety equipment Possible restriction: Entire storage facility n/a |
| Etzel ESE (VGS) | 14 September 2026 to probably 2 October 2026 | planned | injection 29.2 GWh/d, withdrawal 47.0 GWh/d | Test of safety equipment Restriction: Entire storage facility n/a. 100% reduction of withdrawal and injection rate. |
| Etzel ESE (Uniper Energy Storage) | 24 August 2026 to probably 2 October 2026 | planned | withdrawal 203.0 GWh/d | Maintenance of withdrawal train. Possible restriction: Reduction of withdrawal rate by up to 33% |
| Etzel ESE (OMV) | 14 September 2026 to 2 October 2026 | planned | injection 71.8 GWh/d | Maintenance of the Etzel ESE Station |
| Etzel ESE (Uniper Energy Storage) | 14 September 2026 to probably 2 October 2026 | planned | injection 436.0 GWh/d, withdrawal 403.0 GWh/d | Test of safety equipment. Possible restriction: Entire storage facility n/a |
| Etzel ESE (OMV) | 7 September 2026 to 27 September 2026 | planned | injection 71.8 GWh/d | Maintenance of the Etzel ESE Station |
| Etzel ESE (MET) | 7 September 2026 to probably 25 September 2026 | planned | no amount given | Test of safety equipment Possible restriction: Entire storage facility n/a |
| Etzel EKB | 16 September 2026 | planned | injection 162.7 GWh/d, withdrawal 217.0 GWh/d | Annual BEP-maintenance works. Only Dutch connection (GTS) affected. |
| Etzel ESE (MET) | 16 September 2026 | planned | no amount given | Maintenance BEP Pipeline Connection to GTS System n/a |
| Etzel EKB | 13 June 2026 to 4 September 2026 | planned | no amount given | cavern repair works |
| Etzel EKB | 21 August 2026 to 31 August 2026 | planned | withdrawal 217.0 GWh/d | Withdrawal Train Maintenance |
What this means for Germany
Questions and answers
- How full is the gas storage in Etzel?
- On gas day 26 November 2026 the 9 storage sites in Etzel were 68.3% full together: 31.0 of 45.5 TWh of working gas. Thirty days earlier they were 78.5% full, and a year earlier, on gas day 26 November 2025, 83.5%.
- Which storage sites are in Etzel?
- Etzel in Lower Saxony has 9 storage entries in GIE AGSI+, reported by 8 operators: Uniper Energy Storage, EKB, OMV Gas Storage Germany, Equinor Storage Deutschland, EnBW Etzel Speicher, EDF Gas Deutschland, MET Speicher, VNG Gasspeicher GmbH (6).
- Why does Etzel appear several times in AGSI+?
- Several companies store gas at the same location, and each reports its share to GIE AGSI+ as a storage facility of its own. This page adds them up to the location's total.
- How often are the figures updated?
- Operators report each gas day (06:00 to 06:00 German time) to GIE AGSI+ the following evening. This page reads AGSI+ twice a day, in the evening and early in the morning.
Storage by location and operator
Locations: Epe 76% · Nüttermoor 42% · Jemgum 55%
Operators: Uniper 65% · EWE 46% · SEFE 34% · RWE 86% · Storengy 55% · VNG 58% · MET 45%
Other German storage sites
Rehden 22% · VGS Storage Hub (Bernburg, Bad Lauchstädt, Katharina) 58% · Epe Uniper H-Gas 79% · Breitbrunn 6% · Etzel ESE (Uniper Energy Storage) 65% · Etzel EKB 68% · Etzel Erdgas Lager EGL 95% · Uelsen 47% · Jemgum H (SEFE Storage) 61% · Bierwang 78% · VSP NORD (Rehden, Jemgum) 54% · STASSFURT-RWEGSWEST 81% · INNEXPOOL-RWEGSW 90% · Inzenham-West 4% · Etzel ESE (OMV) 37% · EWE H-Gas Zone 45% · Wolfersberg 1% · Peckensen 84% · Jemgum H (EWE) 41% · Ronnenberg-Empelde 98% · Enschede - Epe (Nuon) 72% · Epe-DE-RWEGSWEST (Epe-L prior to 1 April 2026) 88% · Nüttermoor H-3 85% · Nüttermoor H-2 12% · VGS Zone MND ESG (UGS Stockstadt + UGS Haehnlein) 28% · Kraak 79% · Etzel EGL (Equinor Storage Deutschland) 70% · Epe Trianel 68% · Etzel EnBW (VGS) 73% · Nüttermoor H-5 26% · Epe (MET Epe Speicher) 39% · Etzel EDF (VGS) 54% · Schmidhausen 33% · Epe-NL-RWEGSWEST 87% · Lesum 58% · Reckrod 74% · Epe Uniper L-Gas 82% · Etzel ESE (MET) 21% · Enschede - Epe (Eneco) 65% · EWE-Zone L 52% · Harsefeld 61% · Etzel ESE (VGS) 65% · Frankenthal 0% · Rüdersdorf H 88% · TEP Storage Hub (Allmenhausen, Kirchheiligen) 76% · Kiel-Rönne 23%